| |
 |
 |
 |
 |
Planning Mistakes Eliminated |
Friday, May 8, 2026 |
| Reviewer:
Andrew Collins, Mechanical Engineer from Chicago, IL
|
|
During the design stage of a luxury master bathroom renovation, our architect specified a different rough-in depth than the plumbing contractor had planned. Before tile installation, BathSelect's engineering team reviewed our drawings, verified the concealed valve dimensions, and recommended the proper installation depth. That single engineering consultation prevented reopening finished walls and kept the construction schedule intact. Nearly a year after commissioning, the brushed gold finish still resists water spotting, the rainfall pattern remains even across the entire spray face, and routine quarterly maintenance has required nothing beyond standard cleaning.
Was this review helpful to you?
|
 |
 |
 |
 |
|