Home > Installation Instruction For Renata 22" Contemporary RGB Multi Color Water Powered Led Shower Head

Installation Instructions

1. Open the top cover and drill according to the marked position.

  • Mark by the position of the four holes.
  • Take care to avoid wires and pipes to prevent damage.
  • Be sure to confirm that the four holes are on the same horizontal line.

2. Two inlet fittings are connected to the pipe joint of the wall; then the nut, expansion screw, and inlet pipe are connected.

3. Reinstall the top cover.




Mixer







The thermostatic shower mixer is equipped with two stop valves on the inlet side. When you need to repair and maintenance the shower mixer and fittings on each shower mixer, you only need to turn the thermostat clockwise two stop valves, you can turn off the water.